Installation of formwork over the trench
If the soil in a trench solid and the walls do not fall off, in this case, it is appropriate to do the planking over the trench.
Read articleDirectory > Materials for industrial construction > Materials for formwork
Ciros reinforced – clip to the valve, which allows you to quickly attach the formwork of vertical structures and perceives the load of 3 tons. The enhanced version has a galvanized body, hard spring, heavy weight and increased platform support plate spring of the lock. Allows you to stop or significantly reduce the use of tightening screws, nuts for formwork and the clips. Working with the rebar diameter from 6 to 10 mm, for convenience, it is recommended to use presser key for chiros.
Spring clip is easy to use, saves time during Assembly and disassembly of the formwork of foundations, monolithic belts, walls, columns and concrete stairs.
Advantages:
Recommendations for use:
Material |
Tempered galvanized steel |
The size of the plate |
110×75 mm |
The thickness of the plate |
4 mm |
The diameter of the used reinforcement |
6-10 mm |
Load |
≤ 3 t |
Weight |
0.45 kg |
If the soil in a trench solid and the walls do not fall off, in this case, it is appropriate to do the planking over the trench.
Read articleFormwork erecting under the current elevation changes on the site, should be at the lowest point higher than at the top.
Read articleOne of the major advantages of spring clamps-cherosov, is that they are reusable.
Read article